Post date: Jul 11, 2016 2:15:0 PM
Proof of posting is required for all of work from Installation to Maintenance to ensure we are paid for all works without delay-
Please follow these steps to ensure pictures are received correctly:
Area to be clear of tools, passengers, workers prior to picture taken with minmum reflection
Before picture to be taken of the current state of the unit/ area prior to works- this must be clearly labelled
After picture to be taken of end result after works have been completed- this must be clearly labelled
*Muliple pictures to be taken where applicable
Sites codes must accompany all pictures
Pictures must be sent in one of the following formats immediately after shift
Attached to the end of shift report- clearly labelled
Via Wats App- Clearly labelled
Uploaded into a folder on the drive- clearly labelled and shared